Skip to content
Route 28 Bypass Project
  • Home
  • FAQ
  • Get Involved
  • Project Resources
    • Route 28 Corridor Feasibility Study
      • About the Study
      • Meeting Information
      • About NVTA
      • Study Report

Project Resources

Public Meeting #3: Fairfax County Connection & Tie In Point (December 7, 2020)
  • Session Recording
  • Presentation (English)
  • Presentación (Español)
Route 28 Corridor Feasibility Study (December 2017)

Learn more about the Corridor Feasibility Study here.

Public Meeting #1 (December 5 and 6, 2018)
  • Presentation (pdf)
  • Display Boards (pdf)
  • Brochure (pdf)
  • Comment Sheet (pdf)
Public Meeting #2 (October 9, 2019)
  • Presentation (pdf)
  • Display Boards (pdf)
  • Brochure (pdf)
  • Comment Sheet (pdf)
  • Alternatives Maps
    • These alternatives may not represent the final alternatives to be considered and a decision has not been made as to which alternative would be constructed.
    • Alternatives 2A/2B (pdf)
    • Alternative 4 (pdf)
Reports
  • Phase I Architectural Survey (pdf)
  • Battlefield Study (pdf)
  • Threatened and Endangered Species Habitat Survey (pdf)
  • Threatened and Endangered Species Survey (pdf)
  • Waters of the US (WOUS) Delineation Report (pdf)
  • Traffic Technical Report (pdf)
    • Traffic Technical Report Attachments (zip)
  • DRAFT Alternatives Development Technical Memorandum (pdf)
Right of Way/Property Acquisition Information
  • Residential Relocation Benefits Summary Outline (pdf)
  • FHWA – Uniform Act – Real Estate Acquisition Guide (pdf)
  • VDOT Guide – Property Owners and Tenants (pdf)
Alternative 2B Location Map
  • Alternative 2B (April 2020) (pdf)
Route 28
Route 28
Copyright 2021